The second landscape in the series of environments for Regal Rexnord, I was tasked in Spring 2024 to create an environment for equipment used in the Non Renewables industry. The Environment was to have three main areas, being a drilling rig, gas power plant and LNG facility. Each section would have a subset of equipment, being a top drive, fracking pump, mud pumps, gas gen set, generator and drive train compressor.
The landscape was made from scratch using a pallet of custom materials & displacements from quixel bridge, along with forest pack for foliage & scatter objects. The facility assets were approved models purchased by Regal Rexnord taken through octane with custom materials.
The environment would be explored through a series of still images connected via animated transitions, with buttons to access renders of equipment piece from overview images of the three facilities.
This project was completed in mid summer.
Environment highlight reel